Elevate your industrial operations with ASW—home to American-engineered heavy-lift UAVs built to power your toughest challenges.
Home / Docs / Heavy Lift Multirotors / HLM 2 – In Shop Pre-Flight
HLM 2 – In Shop Pre-Flight

Step 1

Main Batteries

  • Ensure that main batteries are fully charged

  • Ensure that main batteries are packed

Step 2

Safety Transmitter

  • Ensure that the Safety Transmitter is charged

  • Ensure that the Safety Transmitter is packed

Step 3

GCS Computer & C2 Modem

  • Ensure that the GCS computer is charged

  • Ensure that maps have been prefetched

  • Ensure that the GCS computer is packed

  • Ensure that the GCS C2 Modem is packed

Step 4

Aircraft

  • Visually inspect aircraft frame, landing gear, arms, and arm screws

  • Ensure that maintenance logs have been checked

  • Ensure that the aircraft is packed

  • Ensure that propellers, if stored separately, are packed

Step 5

Field Power, Tools, Equipment

  • If applicable, ensure that field power is packed

  • Ensure all required tools are packed

  • Ensure all spare equipment is packed

  • Ensure any payload specific equipment is packed

Sales Inquiry

Ready to explore our exceptional products and services? We’re thrilled to connect with you! Just fill out the quick form below, and our dedicated team will promptly reach out to assist you with any questions or inquiries you may have. Let’s embark on an exciting journey together!

Receive the latest news

Looking for fresh content?

We’ll deliver news about new products, sales and exclusive promos. Pretty cool right?